November 22, 2026 USD 44.93EUR 49.28PLN 11.06
Новини Коростень — коротко й по суті
LIVE
Rescue operation in Dymer: 7-year-old boy survives after 14 hours under rubble Polish investigators confirm three Russian missiles breached national airspace AC Milan secures dominant 5-1 victory over Frosinone in Serie A Power Grid Under Pressure: Scheduled Outages Introduced for Monday Germany Tests Ukrainian Delta Combat Management System for Bundeswehr Integration Puppeteer Serhii Soloviov from Zhytomyr is preparing a Christmas nativity scene with special effects The Impact of Overparenting: How Childhood Control Shapes Adult Life US Intelligence Defends Trump Over Putin 'Friend' Remarks Following Nuclear Summit Aртиllery and drone strikes in Kyiv region: Three dead in Vyshneve and rescue ops in Dymer Tragic Border Crossing: Ukrainian Found Dead in Romanian Mountains Rescue operation in Dymer: 7-year-old boy survives after 14 hours under rubble Polish investigators confirm three Russian missiles breached national airspace AC Milan secures dominant 5-1 victory over Frosinone in Serie A Power Grid Under Pressure: Scheduled Outages Introduced for Monday Germany Tests Ukrainian Delta Combat Management System for Bundeswehr Integration Puppeteer Serhii Soloviov from Zhytomyr is preparing a Christmas nativity scene with special effects The Impact of Overparenting: How Childhood Control Shapes Adult Life US Intelligence Defends Trump Over Putin 'Friend' Remarks Following Nuclear Summit Aртиllery and drone strikes in Kyiv region: Three dead in Vyshneve and rescue ops in Dymer Tragic Border Crossing: Ukrainian Found Dead in Romanian Mountains

Heating supply partially suspended in Kyiv due to pipeline damage

🏙️ City 1 min read 👁 0

Emergency repair crews are working to fix a damaged heating pipeline in Kyiv, affecting residents in the Holosiivskyi, Pecherskyi, and Shevchenkivskyi districts.

Heating supply partially suspended in Kyiv due to pipeline damage🏙️City

Photo: Ukrinform

Key points

  • Pipeline damage in central Kyiv
  • Temporary heating outage in three districts
  • Round-the-clock repairs underway

Kyiv municipal utility services are currently addressing a pipeline failure on Velyka Vasylkivska Street. The repair work has necessitated a temporary suspension of heating services for consumers across three central districts of the capital.

Emergency response efforts

The affected area includes several major streets, such as Khreshchatyk, Antonovycha, and Saksahanskoho. The city administration has confirmed that repair operations are being conducted around the clock to ensure the system is restored as quickly as possible.

  • Expected restoration time: 2:00 PM on November 19.
  • Around 40 repair crews have been deployed to the site.

While these localized repairs are ongoing, the city's overall centralized heating network remains fully operational. Authorities have stated that they are prepared to increase the number of personnel on-site if necessary to expedite the replacement of the damaged section.

Source Ukrinform — ukrinform.net/rubric-society/4186129-heating-partially-disrupted-in… ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.